Question: Use the Program Evaluation and Review Technique (PERT) to estimate the time to take this quiz if the optimistic time is 30 minutes, the pessimistic

Use the Program Evaluation and Review Technique (PERT) to estimate the time to take this quiz if the optimistic time is 30 minutes, the pessimistic time is 40 minutes, and the most likely time is optimistic plus 2 minutes. Be sure to use a Beta distribution. Several formulas to consider are as follow: (O + M + P) / 3 = Duration or (O + 4M + P) / 6 = Duration or t1 + t2 + t3 + tn = Duration. A.32 minutes B.40 minutes C.33 minutes D.102 minutes E.34 minutes