Question: Using a Man and Machine Chart, compute the Utilization of the 1) Man 2) Machine Al 3) Machine A2 4) Machine B1 The Operation starts

Using a Man and Machine Chart, compute the Utilization of the 1) Man 2) Machine Al 3) Machine A2 4) Machine B1 The Operation starts when the Operator Loads Machine Al and ends when the Operator finishes unloading Machine B. MACHINE A ACTIVITY LOAD INSPECT TRAVEL MACHINING UNLOAD TIME (MIN) 1 0.5 0.5 7 1 MACHINE B ACTIVITY LOAD INSPECT TRAVEL MACHINING UNLOAD TIME (MIN) 1.5 0 0.5 6.5 1 Using a Man and Machine Chart, compute the Utilization of the 1) Man 2) Machine Al 3) Machine A2 4) Machine B1 The Operation starts when the Operator Loads Machine Al and ends when the Operator finishes unloading Machine B. MACHINE A ACTIVITY LOAD INSPECT TRAVEL MACHINING UNLOAD TIME (MIN) 1 0.5 0.5 7 1 MACHINE B ACTIVITY LOAD INSPECT TRAVEL MACHINING UNLOAD TIME (MIN) 1.5 0 0.5 6.5 1
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
