Question: Using Johnson's rule for 2-machine scheduling, the sequence is: Scheduled Order Job 1 C D E B A F 2 A E F C D
Using Johnson's rule for 2-machine scheduling, the sequence is:
| Scheduled Order | Job |
| 1 | C D E B A F |
| 2 | A E F C D B |
| 3 | C E F D A B |
| 4 | C D A B F E |
| 5 | A F C D B E |
| 6 | D F C E A B |
For the schedule developed using Johnson's rule, the total length of time taken to complete the six jobs (including the 2nd operation) =
nothing
hours (enter your response as a whole number).
.....
Six jobs are to be processed through a two-step operation. The first operation involves sanding, and the second involves painting. Processing times are as follows:
| Job | Operation 1 (hours) | Operation 2 (hours) | ||
| A | 10 | 8 | ||
| B | 3 | 4 | ||
| C | 6 | 2 | ||
| D | 12 | 7 | ||
| E | 5 | 1 | ||
| F | 14 | 13 | ||