Question: Using the information in the table below to test a potential vaccine during clinic trials: Start Node End Node Activity Name (T) in Months (M)
Using the information in the table below to test a potential vaccine during clinic trials:
| Start Node | End Node | Activity Name | (T) in Months | (M) in Months | Cost $ |
| 1 | 2 | A | 16 | 2 | 60 |
| 2 | 3 | B | 5 | 2 | 40 |
| 1 | 4 | C | 25 | 3 | 75 |
| 2 | 4 | D | 7 | 2 | 30 |
| 3 | 5 | E | 10 | 3 | 45 |
| 4 | 5 | F | 8 | 1 | 10 |
| 5 | 6 | G | 5 | 2 | 70 |
Construct a current table showing K and the activities on the Critical Paths(s).
M = maximum reduction of time for activity
T = additional cost associated with reducing activity time for an activity
K = cost of reducing activity time by one time unit for an activity (K = T / M )