Question: Using the risk of incorrect acceptance, tolerable deviation rate, sample size, and the number of deviations shown here, determine the sample deviation rate, computed upper
Using the risk of incorrect acceptance, tolerable deviation rate, sample size, and the number of deviations shown here, determine the sample deviation rate, computed upper deviation rate, and the auditor's conclusion (i.e., testing results do or do not support operating effectiveness of the control) for each control procedure. Use Table 8-8 and 8-9 above for reference.
|
| Control Procedure |
| ||||||||||||||
| Parameters | 1 | 2 | 3 | 4 | ||||||||||||
| Risk of incorrect acceptance | 10 | % |
| 10 | % |
| 5 | % |
| 5 | % |
|
| |||
| Tolerable deviation date | 5 | % |
| 10 | % |
| 4 | % |
| 5 | % |
|
| |||
| Sample size | 80 |
|
| 45 |
|
| 75 |
|
| 125 |
|
|
| |||
| Number of deviations | 0 |
|
| 2 |
|
| 1 |
|
| 2 |
|
|
| |||
| Sample deviation rate |
|
|
|
|
|
|
|
|
|
|
|
|
| |||
| Computed upper deviation rate |
|
|
|
|
|
|
|
|
|
|
|
|
| |||
| Auditor's Conclusion |
|
|
|
|
|
|
|
|
|
|
|
|
| |||