Question: Using the risk of incorrect acceptance, tolerable deviation rate, sample size, and the number of deviations shown here, determine the sample deviation rate, computed upper
Using the risk of incorrect acceptance, tolerable deviation rate, sample size, and the number of deviations shown here, determine the sample deviation rate, computed upper deviation rate, and the auditors conclusion ( i.e. testing results do or do not support operating effectiveness of the control) for each control procedure Use table 8-9 and 8-9 above for reference. (LO 8-6, 8-7)
Risk of incorrect acceptance 10%
Tolerable deviation rate 5%
Sample size 80
Number of deviation 0
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
