Question: Virtual machine migration: Given 4 virtual machine instances (A, B, C, and D) in site SA, to migrate these 4 machines to site SB. If

Virtual machine migration: Given 4 virtual machine instances (A, B, C, and D) in site SA, to migrate these 4 machines to site SB. If virtual machines A and B are dependent each other, while C and D are dependent each other. 


Assuming each virtual machine is 800MB, and the network bandwidth is 100MB/s. During migration, if two dependent virtual machines are separated in two sites, 5 seconds overhead would be incurred. Calculate and compare the time to migrate these 4 virtual machines using 


1) sequential migration 


2) clique migration.

Step by Step Solution

3.52 Rating (165 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Operating System Questions!