Question: We have 2 computer systems having 2 different instruction sets. Each machine has a clock rate of 10MHz. The following measurements were done on these
We have 2 computer systems having 2 different instruction sets. Each machine has a clock rate of 10MHz. The following measurements were done on these machines: Machine I: IC CPI ALU type of instructions: 1 million 1 L&S type of instructions: 2 million 2 Branch type of instructions: 1 million 3 Machine II: IC CPI ALU type of instructions: 2 millions 2 L&S type of instructions: 1 million 4 Branch type of instructions: 4 millions 1 -Calculate execution time of each machine.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
