Question: We have a flow shop problem with 2 machines and 5 jobs. The table below provides the processing time for each job on each machine.Apply

We have a flow shop problem with 2 machines and 5 jobs. The table below provides
the processing time for each job on each machine.Apply Johnsons algorithm to determine the schedule that minimizes makespan.
At each step of the method, you need to provide the set of unscheduled jobs, the unscheduled
job with the smallest processing time on machine 1, the unscheduled job with the smallest
processing processing time on machine 2, and the job you will schedule