Question: We want to design an s control chart. The sensitizing rule we will use is that the process is considered to be in control if
We want to design an s control chart. The sensitizing rule we will use is that the process is considered to be in control if the sample plots between the control limits and out of control otherwise. Describe how you would design the control chart if we want the probability of Type I error to be at most 0.01. Assume that the sample size is 30. (We commit Type I error if we conclude the process has drifted out of control when it has not.)
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
