Question: When developing OPCs we want to show the time that it would take for a qualified operator working at a normal pace to do each
- When developing OPCs we want to show the time that it would take for a qualified operator working at a normal pace to do each of the Operations, this time is referred to as:
- Operator Time
- Normal Time
- Standard Time
- Productive Time
My answer to Q#1 is:
- The objectives of MRP are to:
- Determine the cost of manufacturing
- Establish a schedule to show the times items are required
- Determine the need for items based on higher level demands
- All of the above
- b and c only
My answer to Q#2 is: