Question: When does pre-construction take place? A. After the design is complete B. Before design is complete and construction begins C. During the bidding process D.

When does pre-construction take place? A. After the design is complete B. Before design is complete and construction begins C. During the bidding process D. Prior to the design phase Question 2 (0.5 points) Which one of these is NOT a pre-construction service? A. Feasibility studies B. Conceptual estimating C. Submittals D. Life-cycle cost analysis Question 3 (0.5 points) Which of the following is NOT a cost category in the construction estimate? A. Materials B. Labor C. Equipment D. Property Question 4 (0.5 points) An organizational tool utilized by the construction estimator to create the basic building blocks of both the estimate and schedule is called: A. MasterFormat structure B. Work breakdown structure C. Scope definition D. Uniformat structure

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!