Question: When measuring for capability, Cp may be used in place of Cpk as long as: a. the process mean is in control b. the desired

When measuring for capability, Cp may be used in place of Cpk as long as:

a. the process mean is in control

b. the desired quality standard is no more than 6-sigma

c. the p-chart did not show a discernible pattern

d. the target mean is the same as the process mean

e. the target mean is different from the process mean