Question: When using the critical ratio (CR) to develop a sequence, A. a CR of 1.0 means that the job must be scheduled first. B. a

When using the critical ratio (CR) to develop a

When using the critical ratio (CR) to develop a sequence, A. a CR of 1.0 means that the job must be scheduled first. B. a CR of 1.0 means that the job must be scheduled last. O c. a CR greater than 1.0 means that the job has some slack. OD. a CR less than 1.0 means that the job is ahead of schedule