Question: Which should be asked when establishing baseline stability: 1 A . Is the process stable over time B . Does the process meet the requirements
Which should be asked when establishing baseline stability:
A Is the process stable over time
B Does the process meet the requirements
C Can the process be improved by recentering it
D How can we reduce variation
E A B C & D
An SPC Chart Statistical Process Control needs to include
A Lower control limit
B Upper control limit
C Variation multiplier
D&
E&
The objective of the analyze phase is:
A Process definition
B Establishment of a baseline
C identifying the root cause
D&
E A B & C
Review of process capabilities is typically what part of the DMAIC sixsigma quality improvement process?
A Define
E Measure
F Analyze
G Improve
H Control
Failure mode analysis is typically what part of the DMAIC sixsigma quality improvement process?
A Define
B Measure
C Analyze
D Improve
E Control
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock