Question: Which types of overhead aliocation methods result in the use of more than one owethead rate durng the tame firne period? Mulliple Choice Plantwide overhead

Which types of overhead aliocation methods result in the use of more than one owethead rate durng the tame firne period?
Mulliple Choice
Plantwide overhead rate method and departmental owerhead rate method.
Cost pool overhead rate methad and plantwide overhead rate method.
Departmental overhead rate methad and activity-based costing.
Activity-based costing and plantwide overhead rate method.