Question: Wild Widget must set up an assembly line for widgets. Forecasts show that 44 units per hour should be produced. The tasks required, task times,
Wild Widget must set up an assembly line for widgets. Forecasts show that 44 units per hour should be produced. The tasks required, task times, and precedence relationships are as follows:
| Task | Time (seconds) | Predecessors |
| A | 11 | |
| B | 33 | A |
| C | 17 | A |
| D | 37 | C, B |
| E | 23 | D |
| F | 16 | D |
| G | 41 | E, F |
b. What is the takt time? (Round your answer to the nearest whole number.)
c. What is the theoretical number of workstations? (Round up your answer to the next whole number.)
d. Assign the tasks to the workstations to balance the line using the longest operating time rule.
e. What is the efficiency of the balanced line? (Round your answer to 1 decimal place.)
f. If demand decreased to 34 units per hour, what would be the new takt time? (Round your answer to the nearest whole number.)