Question: Wild Widget must set up an assembly line for widgets. Forecasts show that 50 units per hour should be produced. The tasks required, task times,
Wild Widget must set up an assembly line for widgets. Forecasts show that 50 units per hour should be produced. The tasks required, task times, and precedence relationships are as follows:
.png)
a. Draw the precedence diagram.
b. What is the takt time?
c. What is the theoretical number of workstations
d. Assign the tasks to the workstations to balance the line using the longest operating time rule.
e. What is the efficiency of the balanced line?
f. If demand decreased to 40 units per day, what changes would be needed, if any?
Task Time (seconds) Predecessors 10 30 15 35 25 10 35 C, B E. F
Step by Step Solution
3.34 Rating (178 Votes )
There are 3 Steps involved in it
a b Takt time 60 minhour x 60 secmin50 unitshour 72 seconds per u... View full answer