Question: Work Breakdown Structure (WBS) for the following scope: Requirement 1: 3 bedrooms Requirement 2: 2.5 bathrooms Requirement 3: Pool Requirement 4: 2 patios, one patio

Work Breakdown Structure (WBS) for the following scope:

  1. Requirement 1: 3 bedrooms
  2. Requirement 2: 2.5 bathrooms
  3. Requirement 3: Pool
  4. Requirement 4: 2 patios, one patio should be enclosed

Your WBS should be based upon your chosen Life Cycle Methodology and include any deliverables.