Question: work design and measurement Cycle Time Analysis in Worker-Machine Systems Problem 3 (Problem 2.8 in the Book) A worker is responsible for loading

" work design and measurement " " work design and measurement " Cycle Time
Cycle Time Analysis in Worker-Machine Systems Problem 3 (Problem 2.8 in the Book) A worker is responsible for loading and unloading a production machine. The load/unload elements in the repetitive work cycle have a normal time of only 25 sec, and the machine cycle time is 2.83 min. One part is produced each cycle. Every sixth cycle, the operator must replace the tote pans of parts, which takes 2.40 min (normal time). For setting the standard time, the PFD allowance factor is 15%, and the machine allowance factor is 15%. Determine the standard time under the following alternative assumptions: (a) the irregular element is performed as an external element and (b) the irregular element is performed as an internal element. (c) Determine the corresponding standard daily production quantities (8-hour shift) for each of these time standards

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!