Question: You are an engineer, and you would like to develop a time standard for the car wheel fixing operation. This operation has four steps. For
- You are an engineer, and you would like to develop a time standard for the car wheel fixing operation. This operation has four steps. For each phase, you time 4 cycles. The cycles (in min) for each step are presented below.
Phase 1: 3, 4, 6, 5 minutes
Phase 2: 4, 6, 8, 7 minutes
Phase 3: 8, 6, 9, 8 minutes
Phase 4: 4, 3, 4, 2 minutes
The Pace of Phase 1 is 1.2; for Phase 2 is 0.8; for Phase 3 is 1.1; and for phase 4 is 0.9. A typical workday is 10 hours and 120 minutes is allocated for breaks and lunch. Calculate the normal time and standard time.