You have a project with a cost of $800,000 and your teams are planning to work...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
You have a project with a cost of $800,000 and your teams are planning to work 10,000 hours in 6 months. According to your plan %38 of the work must be finished by the time you do your performance calculations. However, teams have finished % 40 of the work and %50 of your budget has been spent. Please fill the table below using this information, and comment on the project progress for specific indicator. Comments EV Analysis BAC AC PV EV SV CV SPI CPI Formula EV-PV EV-AC EV/PV EV/AC Answer You have a project with a cost of $800,000 and your teams are planning to work 10,000 hours in 6 months. According to your plan %38 of the work must be finished by the time you do your performance calculations. However, teams have finished % 40 of the work and %50 of your budget has been spent. Please fill the table below using this information, and comment on the project progress for specific indicator. Comments EV Analysis BAC AC PV EV SV CV SPI CPI Formula EV-PV EV-AC EV/PV EV/AC Answer
Expert Answer:
Answer rating: 100% (QA)
Based on the given data we update the given table as shown below As seen from the above calculation ... View the full answer
Related Book For
Operations Management Managing Global Supply Chains
ISBN: 978-1506302935
1st edition
Authors: Ray R. Venkataraman, Jeffrey K. Pinto
Posted Date:
Students also viewed these general management questions
-
You have a project to build a new office. The office has 5 walls as shown. Each wall is to take one day to build, and $5500 has been budgeted per wall. The walls were planned to be completed one...
-
Planning is one of the most important management functions in any business. A front office managers first step in planning should involve determine the departments goals. Planning also includes...
-
Suppose you have a project with a Budget at Completion (BAC) of $250,000 and a projected length of 10 months. After tracking the project for six months, you have collected the information in the...
-
______________ is an approach to doing business that attempts to maximize an organization's competitiveness through the continual improvement of the quality of its products, services, people,...
-
Show that for air at 20C the speed of a tube in 1ftes per second is given by, approximately. where the length L and diameter d are in centimeters; we have tried to correct for end effects on tube of...
-
Convert from Fahrenheit (F) to Celsius (C). Use the conversion formula C=(5(F-32))/(9) A city recorded a temperature of 31\deg F. Convert the temperature to Celsius.
-
An electric motor, of mass \(m=100 \mathrm{~kg}\) and operating speed \(=1800 \mathrm{rpm}\), is fixed at the middle of a clamped-clamped steel beam of rectangular cross section, as shown in Fig....
-
The financial records of Dunbar Inc. were destroyed by fire at the end of 2012. Fortunately, the controller had kept certain statistical data related to the income statement as presented below. 1....
-
Let Timco use a capital structure that is 30% debt and 70% equity, The firm can borrow at 5%. The tax rate is 40%. Let the firm beta be 1.5, the market return 14%, and the risk free rate 2%. Find the...
-
This Mini Practice Set will help you review all the key concepts of the accounting cycle for a merchandising company, along with the integration of payroll. Betty Loeb took over the business now...
-
(x4 +3x2+4) (x3 + 2x2 + 5x-2) 1. Simplify the following expression: a1x7 + a2x6a3x5 + Note the simplified expression should be written as: (5x2+x) (2x-3+x) 2. Simplify the following expression: 3....
-
How can identifying your job interests, abilities, and attributes help you develop an effective rsum?
-
What does it mean to view conflict as an opportunity?
-
In the working world, how might it be an advantage to be a high self-monitor? How might it be a disadvantage?
-
What is a shared story? What makes it useful for managing difficult conversations?
-
Why are exaggerating and taking either/or approaches counterproductive?
-
Byron Limited estimated the net present value of future cash flows from specialised equipment acquired under a business combination to be $120 000. A replacement cost for the equipment is estimated...
-
The slopes of the tangents at the points where the curve y = x2 - 4x intersects the X-axis is 1) 1 2) +2 3) +3 4) +4
-
The fictitious Cool Air Inc. assembles three models (A, B, and C) of air conditioners. The production manager at Cool Air plant wants to implement uniform production and mixed-model scheduling. The...
-
What does the term shadow price mean in the linear programming sensitivity analysis output obtained using Excel Solver?
-
Discuss the concept of time-based competition.
-
Sandblasting is a process in which an abrasive material, entrained in a jet, is directed onto the surface of a casting to clean its surface. In a particular setup for sandblasting, the casting of...
-
\(f(t)=\delta(t-\tau)\) corresponds to a force applied at a. \(t-\tau=0\) b. \(t-\tau <0\) c. \(t-\tau>0\)
-
Find the response of a viscously damped system under the periodic force whose values are given in Problem 1.116. Assume that \(M_{t}\) denotes the value of the force in newtons at time \(t_{i}\)...
Study smarter with the SolutionInn App