Question: In the hand simulation of the simple processing system, suppose that a constant setup time of 3 minutes was required once a part entered the
In the hand simulation of the simple processing system, suppose that a constant setup time of 3 minutes was required once a part entered the drill press but before its service could actually begin. When a setup is going on, regard the drill press as being busy. Plot the total number of parts in system as a function of simulated time. As numerical output performance measures, report the total production (number of parts produced), the average and maximum waiting time in queue, the average and maximum total time in system, the time-average and maximum number of parts in queue, and the drill-press utilization. Redo the hand simulation and discuss the results.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
