Question: 8. Production activity controls (PAC) main link with the rest of the MPC system is a. Detailed capacity planning b. Detailed material planning c. Material
8. Production activity control’s (PAC) main link with the rest of the MPC system is
a. Detailed capacity planning
b. Detailed material planning
c. Material and capacity plans
d. Master production scheduling