Question: 9. The shop-floor control (SFC) system is kept current on changes to the material plan by the MRP system. a. True b. False
9. The shop-floor control (SFC) system is kept current on changes to the material plan by the MRP system.
a. True
b. False
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts