Question: The shop-floor control (SFC) system is kept current on changes to the material plan by the MRP system. a. True b. False . Formal shop-floor

The shop-floor control (SFC) system is kept current on changes to the material plan by the MRP system.

a. True

b. False

. Formal shop-floor control systems are necessary in a just-in-time (JIT) system.

a. True

b. False