Question: A three-phase (34.5-mathrm{kV}) feeder supplying a 3.5-MVA load is protected by (80 mathrm{E}) power fuses in each phase, in series with a recloser. The time-current

A three-phase \(34.5-\mathrm{kV}\) feeder supplying a 3.5-MVA load is protected by \(80 \mathrm{E}\) power fuses in each phase, in series with a recloser. The time-current characteristic of the 80E fuse is shown in Figure 10.43. Analysis yields maximum and minimum fault currents of 1000 and \(500 \mathrm{~A}\), respectively,

(a) To have the recloser clear the fault, find the maximum clearing time necessary for recloser operation.

(b) To have the fuses clear the fault, find the minimum recloser clearing time. Assume that the recloser operating time is independent of fault current magnitude.

Time in seconds 0.5 0.3 0.2 0.1 0.06 0.03 0.02 0.01 T

Time in seconds 0.5 0.3 0.2 0.1 0.06 0.03 0.02 0.01 T T Minimum melting time 300 500 1 Current limiting 80E power fuse 34.5 kV 60 Hz 25 C ambient Maximum clearing time 1000 Current in amperes 2000 L L L 5000

Step by Step Solution

3.42 Rating (165 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Systems Analysis Design Questions!