Question: The following precedence network displays the 3-Point estimates for each activity of a project. Determine: a. The expected duration for each path and its variance.
The following precedence network displays the 3-Point estimates for each activity of a project. Determine:
a. The expected duration for each path and its variance.
b. The probability that the project will require more than 49 weeks.
c. The probability that the project can be completed in 46 weeks or less.
.png)
11-12-13 2 9-10-12 3 5-7-10 4 14-18-26 8-10-14 5-6-7 5 End 8-8-8 13-13-13 10.5-13-15.5 13 10-1214 7-10 12 10-11-12 10 12
Step by Step Solution
3.34 Rating (157 Votes )
There are 3 Steps involved in it
a 1234 1567 1589 Path b 43 40 110111213 4683 C Mean 3734 Activity 1 2 in 5 10 3 ... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
686-B-M-L-O-M (5300).docx