Question: The following table details the tasks required for Indiana- based Frank Pianki Industries to manufacture a fully portable industrial vacuum cleaner. The times in the

The following table details the tasks required for Indiana- based Frank Pianki Industries to manufacture a fully portable industrial vacuum cleaner. The times in the table are in minutes. Demand forecasts indicate a need to operate with a cycle time of 10 minutes.

IMMEDIATE ACTIVITY ACTIVITY DESCRIPTION PREDECESSORS TIME A Attach wheels to tub в Attach motor to lid 1.5 Attach batte

a) Draw the appropriate precedence diagram for this production line.

b) Assign tasks to workstations and determine how much idle time is present each cycle. c) Discuss how this balance could be improved to 100%.

d) What is the theoretical minimum number of workstations?


IMMEDIATE ACTIVITY ACTIVITY DESCRIPTION PREDECESSORS TIME A Attach wheels to tub Attach motor to lid 1.5 Attach battery pack Attach safety cutoff B 4 Attach filters Attach lid to tub Assemble attachments D, F, G 3.5 H. Function test Final inspection Packing 2

Step by Step Solution

3.32 Rating (164 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

a b Station 1 gets A G and B and has 05 minutes left over Station 2 gets C D and E with no time ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

286-B-M-L-O-M (2514).docx

120 KBs Word File

Students Have Also Explored These Related Management Leadership Questions!