Question: Three factories each dump waste water containing three different types of pollutants into a river. State regulations require the factories to treat their waste in
.png)
If the state requires a reduction of at least 65 tons per day of pollutant 1, at least 40 tons per day of pollutant 2, and at least 20 tons per day of pollutant 3, find the number of tons of waste that must be treated each day at each site so that the state's requirements are satisfied and the treatment costs are minimized. Find the minimum cost.
Use the simplex method, Excel, or some other technology.
Factory 2 45% Factory 1 Factory 3 Pollutant 1 Pollutant 2 Pollutant 3 20% 15% 5% 75% 65% 10% 30% 15% Cost/ton $20 $8 $50
Step by Step Solution
3.50 Rating (167 Votes )
There are 3 Steps involved in it
Let y 1 tons of waste treated at Factory 1 y 2 tons of waste treate... View full answer