Question: Two loads connected in parallel draw a total of 2.4 kW at 0.8 pf lagging from a 120-V rms, 60-Hz line. One load absorbs 1.5

Two loads connected in parallel draw a total of 2.4 kW at 0.8 pf lagging from a 120-V rms, 60-Hz line. One load absorbs 1.5 kW at a 0.707 pf lagging. Determine:
(a) The pf of the second load,
(b) The parallel element required to correct the pf to 0.9 lagging for the two loads.

Step by Step Solution

3.26 Rating (167 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

a pf 08 cos 1 1 3687 o Q S si... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

905-P-E-M-C (1132).docx

120 KBs Word File

Students Have Also Explored These Related Electricity and Magnetism Questions!