Question: Two loads connected in parallel draw a total of 2.4 kW at 0.8 pf lagging from a 120-V rms, 60-Hz line. One load absorbs 1.5
(a) The pf of the second load,
(b) The parallel element required to correct the pf to 0.9 lagging for the two loads.
Step by Step Solution
3.26 Rating (167 Votes )
There are 3 Steps involved in it
a pf 08 cos 1 1 3687 o Q S si... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
905-P-E-M-C (1132).docx
120 KBs Word File
