Question: Using the information in Problem 9-58, complete the following: Current Proposed Materials and purchased parts $ 60.00 $ 15.00 Direct labor 12.50 13.75 Variable overhead
Using the information in Problem 9-58, complete the following:
| Current | Proposed | |
| Materials and purchased parts | $ 60.00 | $ 15.00 |
| Direct labor | 12.50 | 13.75 |
| Variable overhead | 25.00 | 30.00 |
| Fixed overhead | 40.00 | 20.00 |
| Manufacturing information for CB3668 | ||
| Number of setups | 3,000 | 2,300 |
| Batch size | 50 | 50 |
| Cost per setup | $ 300 | $ 300 |
| Machine hours | $ 88,000 | $ 55,000 |
Required
1. Compute the breakeven in units for both the current and proposed manufacturing plans, assuming that setup costs vary with the number of batches. Assume that setup costs are the only costs that vary with the number of batches.
2. Compare your solution above to that for Problem 9-58 and interpret the difference.
Step by Step Solution
3.26 Rating (155 Votes )
There are 3 Steps involved in it
1 Setup costs are 300 per setup and there are 3000 setups so total setup costs must be 900000 3000 x 300 Thus the total fixed costs for the current ma... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
249-B-M-L-P (350).xlsx
300 KBs Excel File
