Question: A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the
A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table.
.png)
a. Determine the average cycle time for each element.
b. Find the normal time for each element.
c. Assuming an allowance factor of 15 percent of job time, compute the standard time for this job.
OBSERVATIONS (minutes per cycle) Performance Rating Element 0.44 1.50 0.84 1.10 0.50 1.54 0.89 1.14 0.43 1.47 0.77 1.08 0.45 1.51 0.83 1.20 0.48 1.49 0.85 1.16 0.46 1.52 0.80 1.26 90% 85 110 100
Step by Step Solution
3.49 Rating (172 Votes )
There are 3 Steps involved in it
Given A time study was conducted of a job with four elements The observed times and performance rati... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
372-B-M-L-O-M (3082).docx
120 KBs Word File
