Question: A time study was conducted on a job that contains four tasks. Tire observations and performance ratings for six cycles are shown in tire following

A time study was conducted on a job that contains four tasks. Tire observations and performance ratings for six cycles are shown in tire following table.

A time study was conducted on a job that contains

a. Calculate the average time for each task.
b. Calculate the normal time for each task.
c. Assuming an allowance factor of 15 percent of workday, calculate the standard time for this job.

Observations (minutes per cycle) Performance Rating 90% 85 Task 3 5 6 46 1.50 1.54 1.47 1.51 149 152 80 .10 114 .08 20 .16 1.26 .50 .43 45 46 84 89 83 85 100

Step by Step Solution

3.38 Rating (160 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

AF day 1 1 15 118 Afday Task 1 2 3 4 118 Performance R... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

686-B-M-L-O-M (4836).docx

120 KBs Word File

Students Have Also Explored These Related Management Leadership Questions!