Anguilla Manufacturing is interested in using the data collected during Value Stream Mapping to evaluate the current state performance of the capacity of its manual assembly line process under different batch size assumptions. The availability of processing per shift, after accounting for breaks and a mid-shift employee meeting, is 436 minutes. The current operating characteristics of each processing step are found in the table below. Note that each step can only process one part at a time and all steps must process the same sized batches.

Anguilla Manufacturing is interested in using the data collected during

a. Calculate the average processing time per unit and the capacity at each step assuming batch sizes of:
i. 10 units
ii. 20 units
iii. 30 units
iv. 40 units
b. Identify the bottleneck operation and the line's processing capacity for each batch size listed in part a.
c. Explain why batch sizes beyond 40 units will not increase the line's processing capacity further.

Saw Sand Drill Dr Assemble Mark Cycle time per part 20 seconds 15 seconds 30 seconds 25 seconds 10 seconds Setupm 3 minutes 4 minutes 0 minutes 3 minutes 8 minutes per batch

Step by Step Solution

3.40 Rating (162 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Anguilla Manufacturing a The average processing time per unit and the capacity at each step is calculated as follows i Batch size 10 Saw processing ti... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

1011-B-M-L-O-M (5783).docx

120 KBs Word File

Students Have Also Explored These Related Management Leadership Questions!