Question: Electro Fans has just received an order for one thousand 20-inch fans due week 7. Each fan consists of a housing assembly, two grills, a

Electro Fans has just received an order for one thousand 20-inch fans due week 7. Each fan consists of a housing assembly, two grills, a fan assembly, and an electrical unit- The housing assembly consists of a frame, two supports, and a handle. The fan assembly consists of a hub and five blades. The electrical unit consists of a. motor, a switch, and a knob. The following table gives lead times, on-hand inventory, and scheduled receipts.

Electro Fans has just received an order for one thousand

(a) Construct a product structure.
(b) Construct a time-phased product structure.
(c) Prepare a net material requirementsplan.

Lead On Hand' Lot Scheduled ComponentTime Inventory Size Receipt 20 Fan 100 100 kHousing Frame 2 Supports (2)I Handle 50 100 400 500 200 500 150 Grills (2) Fan Asscmbly 3 2 Hub Blades (5 2 100 Electrical Unit1 Motor Switch Knob 20 12 25 200 knobs in week 2

Step by Step Solution

3.26 Rating (167 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

To tackle this problem we need to go through each part constructing a product structure a timephased structure and then preparing a net material requi... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

256-B-M-L-O-M (1954).docx

120 KBs Word File

Students Have Also Explored These Related Management Leadership Questions!