Question: A part structure, lead time (weeks), and on-hand quantities for product A are shown in figure 14.16. From the information shown, generate (a) An indented
.png)
(a) An indented bill of material for product A (see figure 5.9 in chapter 5 as an example of a BOM).
(b) Net requirements for each part to produce 10 AS in week 8 usinglot-for-lot.
INVENTORY PART ON HAND PART STRUCTURE TREE LT-lead time in weeks (1) All quantities 1 A 1 LT , 10 5 4 OLT-1 (1)ILT=1 10
Step by Step Solution
3.56 Rating (177 Votes )
There are 3 Steps involved in it
a Level Component Quantity 0 A 1 1 B 1 2 C 1 2 D 1 3 E 1 1 F 1 2 G 1 2 H 1 3 E 1 3 C 1 With lowlevel coding C would be a level 3 code b Low Lot Lead O... View full answer