Question: In a Q system, the demand rate for strawberry ice cream is normally distributed, with an average of 300 pints per week. The lead time
In a Q system, the demand rate for strawberry ice cream is normally distributed, with an average of 300 pints per week. The lead time is 9 weeks. The standard deviation of weekly demand is 15 pints.
a. What is the standard deviation of demand during the 9-week lead time?
b. What is the average demand during the 9-week lead time?
c. What reorder point results in a cycle-service level of 99 percent?
Step by Step Solution
3.49 Rating (162 Votes )
There are 3 Steps involved in it
A Q system also known as a reorder point system d 300 pintsweek d 15 pints a Standard deviation ... View full answer