Question: Prepare a master production schedule for industrial pumps in the manner of Figure in the chapter. Use the same inputs as the example, and lot
Prepare a master production schedule for industrial pumps in the manner of Figure in the chapter. Use the same inputs as the example, and lot sizes of 70, but change the MPS rule from “schedule production when the projected on- hand inventory would be negative without production” to “schedule production when the projected on- hand inventory would be less than 10 without production.”
Step by Step Solution
★★★★★
3.37 Rating (166 Votes )
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Given Use the industrial pumps information from Figure 1111 June July 1 2 3 4 5 6 7 8 Forecast 30 30 ... View full answer