In a process design, the following process streams must be cooled or heated:Stream No.10-3 in Cp kW/C Temperature In CTemperature Out C 5 2 3 2 1 2 23 4 280 220 100 60 220 60 260 220

  • The hottest hot-utility stream is high-pressure steam at 254°C. Use the MUMNE algorithm for heat-exchanger networks and a minimum approach temperature of 20°C.
  • Determine the temperature interval diagram.
  • Determine the cascade diagram, the pinch temperatures, and the minimum hot and cold utilities.
  • Determine the minimum number of heat exchangers above and below the pinch.
  • Determine a heat-exchanger network above the pinch. (Be careful!)
  • Determine the heat-exchanger network below the pinch.
Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  answer-question

Analysis Synthesis And Design Of Chemical Processes

ISBN: 9780134177403

5th Edition

Authors: Richard Turton, Joseph Shaeiwitz, Debangsu Bhattacharyya, Wallace Whiting

Question Posted: