Question: A nonpipeline system takes 50 ns to process a task. The same task can be processed in a six-segment pipeline with a clock cycle of
A nonpipeline system takes 50 ns to process a task. The same task can be processed in a six-segment pipeline with a clock cycle of 10 ns. Determine the speedup ratio of the pipeline for 100 tasks. What is the maximum speedup that can be achieved?
Step by Step Solution
3.31 Rating (172 Votes )
There are 3 Steps involved in it
To determine the speedup ratio of the pipeline for 100 tasks we need to compare the time it takes to process 100 tasks in the nonpipeline system to th... View full answer
Get step-by-step solutions from verified subject matter experts
