Question: Using the information displayed in the following table, identify the near critical path. A. A-B-E B. A-C-E C. A-D-E D. A-E-D Activity Name Successor Duration

Using the information displayed in the following table, identify the near critical path.Activity Name Successor Duration 5 A B, C, D B E C

A. A-B-E B. A-C-E C. A-D-E D. A-E-D

Activity Name Successor Duration 5 A B, C, D B E C E D E 227 10 E None 2