Question: You have built a synchronizer using flip-flops with T 0 = 20 ps and = 30 ps. Your boss tells you that you need
You have built a synchronizer using flip-flops with T0 = 20 ps and τ = 30 ps. Your boss tells you that you need to increase the MTBF by a factor of 10. By how much do you need to increase the clock period?
Step by Step Solution
3.52 Rating (172 Votes )
There are 3 Steps involved in it
We assume a two flip flop synchronizer The most signi... View full answer
Get step-by-step solutions from verified subject matter experts
