After several investigations of points outside control limits revealed nothing, a manager began to wonder about the
Question:
After several investigations of points outside control limits revealed nothing, a manager began to wonder about the probability of a Type I error for the control limits used (z = 1.90).
a. Determine the alpha risk (i.e., P [Type I error]) for this value of z.
b. What z would provide an alpha risk of about 2 percent?