Refer to problem 19. Using the information provided in that problem and the following data, prepare an

Question:

Refer to problem 19. Using the information provided in that problem and the following data, prepare an MRP table for finished product R.

4 6. 8. 9. Week Gross Requirements 20 25 35 85 70 95 55 70 80 85


The minimum production lot size for R is 60. Assume no beginning inventory.


Data from problem 19

A finished product R is assembled from two units of S and two units of Q. Production of S requires two units of K, three units of L, and one unit of M. Q is produced from two units of X and three units of Z.