Question: The production process at ABC Manufacturing is as shown in the following figure: A product in this production process needs to go through only one

The production process at ABC Manufacturing is as shown in the following figure:

Grinding 7 units/hour Painting 2 units/hour Milling 7 units/hour Painting 2 units/hour Assembly 3 units/hour Shearing 5


A product in this production process needs to go through only one of the painting operations:

1. Which one of the operations in the previous figure is a bottleneck operation?

2. If Orion Manufacturing operated 8 hours/day, 25 days/month, what is the monthly capacity of the company€™s production process?

Grinding 7 units/hour Painting 2 units/hour Milling 7 units/hour Painting 2 units/hour Assembly 3 units/hour Shearing 5 units/hour Drilling 6 units/hour Painting 2 units/hour

Step by Step Solution

3.42 Rating (161 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

1 The bottleneck is ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Operations Management Questions!