Question: 0 points ) Suppose that loads for a crane are arriving at a steady rate of one every 1 5 minutes. The crane has the
points Suppose that loads for a crane are arriving at a steady rate of one
every minutes. The crane has the capacity to handle one load every
minutes. Suppose further that the crane breaks down for minutes. How
many loads are delayed, what is the total delay, and how long will be required
before the crane can catch up with the backlog of loads?