Question: 1 . [ 1 0 pts ] Which operation is the main bottleneck process for the line? Is variability increased or decreased downstream from it

1.[10pts] Which operation is the main bottleneck process for the line? Is variability increased or decreased downstream from it? Explain the rationale for your answer.
2.[15pts] Calculate CVe, re, and CVd for OP1. You may use the spreadsheet to confirm, but must show work.
3.[15pts] It is desired to reduce flowtime and WIP for the system significantly. There are four alternatives, each of approximately equal cost:
a.OP4 and OP2 positions can be swapped on the line
b.The processing time standard deviation of OP 2 can be reduced by (1)/(2).
c.OP2 processing time can be reduced to 1.65
d.The MTTF of OP2 can be extended to 200 hours.
Which option should be selected? Justify your answer. Use the spreadsheet.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!