Question: 1 . [ 1 0 pts ] Which operation is the main bottleneck process for the line? Is variability increased or decreased downstream from it
pts Which operation is the main bottleneck process for the line? Is variability increased or decreased downstream from it Explain the rationale for your answer.
pts Calculate CVe, re and CVd for OP You may use the spreadsheet to confirm, but must show work.
pts It is desired to reduce flowtime and WIP for the system significantly. There are four alternatives, each of approximately equal cost:
aOP and OP positions can be swapped on the line
bThe processing time standard deviation of OP can be reduced by
cOP processing time can be reduced to
dThe MTTF of OP can be extended to hours.
Which option should be selected? Justify your answer. Use the spreadsheet.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock