Question: 1 7 . The time - phased net requirements for the base assembly in a table lamp over the next six weeks are Week 1

17. The time-phased net requirements for the base assembly in a table lamp over the next six weeks are
Week 123456 Requirements 335200140440300200
The setup cost for the construction of the base assembly is $200, and the hold- ing cost is $0.30 per assembly per week.
a. What lot sizing do you obtain from the EOQ formula?