Question: 1 . 9 The starting work part costs $ 2 . 0 0 in a batch production operation. Batch quantity = 1 0 0 parts.

1.9 The starting work part costs $2.00 in a batch production operation. Batch quantity =100 parts. Each cycle, part handling time =0.40 min, and operation time =1.52 min. Setup time =50 min. Equipment cost rate = $30.00/hr, and labor cost rate = $18.00/hr, including overhead costs. There is no tool change or tool cost in the operation. The machine tool is 100% reliable, and scrap rate =2%. Determine (a) pro- duction rate, (b) finished part cost, and (c) number of hours required to complete the batch

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!