Question: 1 . 9 The starting work part costs $ 2 . 0 0 in a batch production operation. Batch quantity = 1 0 0 parts.
The starting work part costs $ in a batch production operation. Batch quantity parts. Each cycle, part handling time min, and operation time min. Setup time min. Equipment cost rate $hr and labor cost rate $hr including overhead costs. There is no tool change or tool cost in the operation. The machine tool is reliable, and scrap rate Determine a pro duction rate, b finished part cost, and c number of hours required to complete the batch